PROJECTS

 

Results: 22 Projects found.
  • Blank

    Metra 95th/Riverdale Substations

    Chicago / Riverdale, IL

    Projected Completion Date: Spring 2020

    The project scope includes the upgrade of two electrical tie stations on the Metra Electric District, and is part of an overall plan to substantially increase the power capacity for the rail line.

    READ MORE
  • CTA_Electric_Buses_200x150

    CTA Electric Bus Charger Station Infrastructure

    Chicago, IL

    Projected Completion Date: March 2020

    New en-route bus chargers will be installed to support a new CTA fleet of fully electric buses.

    READ MORE
  • Blank

    IDOT Illinois Route 120 Improvements over U.S. Route 41

    Park City / Waukegan / Gurnee, IL

    Projected Completion Date: October 2019

    Improvement of Illinois State Route 120 in Lake County, including the removal and replacement of bridge deck and rehabilitation of bridge structures.

    READ MORE
  • PH_Tower12Pic1_20181021_200x150

    CTA Green Line Stations Renewal and Tower 12 Replacement

    Chicago, IL

    Completion Date: November 2018

    This project involved the rehabilitation of four CTA stations on the Green Line (Kedzie, 51st, Cottage Grove, Halsted), and replacement of CTA's Tower 12 located in the southeast corner of the Loop.

    READ MORE
  • Blank

    Illinois Tollway Roadway Resurfacing and Bridge Repairs

    DeKalb Twp / Malta Twp / Dement Twp / Rochelle, IL

    Projected Completion Date: Winter 2020

    This project is for the roadway and bridge rehabilitation of 7 mainline bridges and culverts, and 9 crossroad bridges along the Reagan Memorial Tollway (I-88) between IL Route 251 and Annie Glidden Road, a 15 mile section.

    READ MORE
  • Blank

    Illinois Tollway 159th Street Interchange Project

    Markham, IL

    Projected Completion Date: Spring 2019

    This project scope includes rebuilding the existing 159th Street bridge and reconstructing four ramps at the 159th Street Interchange

    READ MORE
  • z100_reflection_-_From_Metra_200x150

    Metra Z-100 Bridge Project

    Elgin, IL

    Projected Completion Date: December 2020

    Metra is replacing a 137-year-old single-track bridge across the Fox River in Elgin, Illinois with a two-track structure, to eliminate a bottleneck for train traffic.

    READ MORE
  • JaneByrne2007_200x150

    IDOT Circle Interchange Retaining Wall and Water Main/Sewer Improvements

    Chicago, IL

    Projected Completion: Spring 2019

    This project includes construction of a new concrete retaining wall and rehabilitation of five existing water mains near UIC.

    READ MORE
  • Chicago_LED_Streetlights_20190102_(15)_200x150

    CDOT Smart Lighting Project

    Chicago, IL

    Projected Completion Date: June 2022

    The Chicago Smart Lighting Project is designed to improve public safety and quality of life by providing better, more reliable outdoor lighting.

    READ MORE
  • East_Lake_Exterior_20181029_200x150

    CTA East Lake, Milwaukee and Illinois Substations

    Chicago, IL

    Projected Completion Date: December 2019

    The traction power equipment at the East Lake, Milwaukee, and Illinois substations is being replaced, and the building envelopes at these three locations are being rehabilitated.

    READ MORE
  • CTA_IMD_Flickr_200x150

    CTA Illinois Medical District Station Renovation Project

    Chicago, IL

    Completion Date: August 2018

    The CTA IMD station renovation included rebuilding the main stationhouse, increasing accessibility for customers and making other improvements to the popular station that provides access to major renowned hospitals and health institutions.

    READ MORE
  • 1011-01_Quincy_Rendering

    CTA Quincy Loop Station Upgrade Project

    Chicago, IL

    Completion Date: January 2019

    The Quincy station, originally opened in 1897, is one of the oldest and best-preserved stations on the CTA system. The scope included construction of two new elevators, a new exit stairway from the platform, and other improvements to make it fully accessible.

    READ MORE
  • Renewed_track_near_the_Riddgeland_Station

    CTA Green Line West Track Renewal Project

    Chicago, IL

    Completion Date: June 2016

    The CTA Green Line West Track Renewal Project rehabilitated track infrastructure between Laramie and Harlem/Lake stations in order to provide customers a smoother, more reliable commute.

    READ MORE
  • PH_PB_MR_Hubbard__Curve_looking_north_from_MM_20160115_SIZED

    CTA Ravenswood Loop Connector Signal Renewal

    Chicago, IL

    Projected Completion Date: February 2019

    Upgrade of the existing signal system on CTA's Brown Line between Armitage and Merchandise Mart. In addition to the signal system, the project also features civil/structural, mechanical and communications aspects.

    READ MORE
  • Blank

    NICTD Positive Train Control

    Chicago, IL

    Projected Completion Date: December 2019

    The Northern Indiana Commuter Transportation District (NICTD), is installing Positive Train Control (PTC) in each of its trains and along the 75 miles of track for the South Shore Line.

    READ MORE
  • 1008-01_PH_AW_4G_Subway_SIZED

    CTA 4G Subway Cellular Upgrades Project

    Chicago, IL

    Completion Date: January 2016

    Scope included installation of a Next Generation Distributed Antenna System (NG-DAS) which replaced the existing system and made Chicago the largest U.S. public transit system with 4G cellular coverage in all subway stations and tunnels.

    READ MORE
  • 1007-05_New_South_Terminal_Entrance_Opened

    CTA 95th Terminal Improvement Project

    Chicago, IL

    Projected Completion Date: June 2019

    Scope includes construction of brand new passenger terminals on the north and south side of 95th St. as well as track replacement, installation of 96th St. crossover and relay house, and other upgrades in the yard.

    READ MORE
  • 1006-01_J13-056MetalFlashingInstall_20141114

    CTA Job Order Contracting (JOC 10)

    Chicago, IL

    Completion Date: September 2017

    CTA’s Job Order Contracting (JOC) Program allowed three pre-qualified General Contractors to compete over various mid-sized construction projects. Work Orders of varying sizes and scopes are performed from station and building repairs to system improvements such as track work.

    READ MORE
  • 1005-01_After-New_Entrance_Canopy_SIZED

    CTA Harrison Station Rehabilitation Project

    Chicago, IL

    Completion Date: October 2014

    Work performed included new main entrance canopies, stairway repairs, new floor and wall finishes, painting and cleaning of all stairways, mezzanines, and platform areas, and updated system signage throughout the station and entrances.

    READ MORE
  • 1007-11_1959_N263-59_1_CTAcoll_SIZED

    CTA Wilson Station Reconstruction Project

    Chicago, IL

    Completion Date: February 2018

    Project scope included construction of a brand new station along with the removal, realignment and reconstruction of the elevated 4 track structure, tracks, traction power system, and signal system from north of Montrose Ave. to the abutment north of Leland Ave.

    READ MORE
  • 1002-108_Red_South_Reconstruction_-_Week_10

    CTA Dan Ryan Track Renewal & Station Improvements Project

    Chicago, IL

    Completion Date: June 2014

    The Project consisted of full depth reconstruction of the Red Line Dan Ryan Branch. Work was performed during an unprecedented 154 day extended line cut and included trackwork, drainage system, signal and traction power.

    READ MORE
  • Berwyn_Platform_Finished1_SIZED

    CTA North Main Line Stations Rehabilitation Project

    Chicago, IL

    Completion Date: January 2013

    This project consisted of Design and Construction Services for the rehabilitation of seven stations on CTA’s North Red Main Line.

    READ MORE
Results: 22 Projects found.