PROJECTS

 

Results: 8 Projects found.
  • PH_PB_MR_Hubbard__Curve_looking_north_from_MM_20160115_SIZED

    CTA Ravenswood Loop Connector Signal Renewal

    Chicago, IL

    Projected Completion Date: Feb 2018

    Upgrade of the existing signal system on CTA's Brown Line between Armitage and Merchandise Mart. In addition to the signal system, the project will also feature civil/structural, mechanical and communications aspects.

    READ MORE
  • 1008-01_PH_AW_4G_Subway_SIZED

    CTA 4G Subway Cellular Upgrades Project

    Chicago, IL

    Completion Date: Jan 2016

    Scope includes installation of a Next Generation Distributed Antenna System (NG-DAS) which replaces the existing system and will give Chicago the largest U.S. public transit system with 4G coverage in all subway stations and tunnels.

    READ MORE
  • 1007-01_Artists_Renderin_SIZED

    CTA 95th Terminal Improvement Project

    Chicago, IL

    Projected Completion Date: Jun 2019

    Scope includes construction of brand new passenger terminals on the north and south side of 95th St. as well as track replacement, installation of 96th St. crossover and relay house, and other upgrades in the yard.

    READ MORE
  • 1006-01_J13-056MetalFlashingInstall_20141114

    CTA Job Order Contracting (JOC 10)

    Chicago, IL

    Projected Completion Date: Sep 2016

    CTA’s Job Order Contracting (JOC) Program allows three pre-qualified General Contractors to compete over various mid-sized construction projects. Work Orders of varying sizes and scopes are performed from station and building repairs to system improvements such as trackwork.

    READ MORE
  • 1005-01_After-New_Entrance_Canopy_SIZED

    CTA Harrison Station Rehabilitation Project

    Chicago, IL

    Completion Date: Oct 2014

    Work performed included new main entrance canopies, stairway repairs, new floor and wall finishes, painting and cleaning of all stairways, mezzanines, and platform areas, and updated system signage throughout the station and entrances.

    READ MORE
  • 1007-11_1959_N263-59_1_CTAcoll_SIZED

    CTA Wilson Station Reconstruction Project

    Chicago, IL

    Projected Completion Date: Jan 2018

    Project scope includes construction of a brand new station along with the removal, realignment and reconstruction of the elevated 4 track structure, tracks, traction power system, and signal system from north of Montrose Ave. to the abutment north of Leland Ave.

    READ MORE
  • 1002-108_Red_South_Reconstruction_-_Week_10

    CTA Dan Ryan Track Renewal & Station Improvements Project

    Chicago, IL

    Completion Date: Jun 2014

    The Project consisted of full depth reconstruction of the Red Line Dan Ryan Branch. Work was performed during an unprecedented 154 day extended line cut and included trackwork, drainage system, signal and traction power.

    READ MORE
  • Berwyn_Platform_Finished1_SIZED

    CTA North Main Line Stations Rehab

    Chicago, IL

    Completion Date: Jan 2013

    The Project consisted of Design and Construction Services with a Guaranteed Maximum Price by a Design / Build Contractor for the rehabilitation of 7 stations on CTA’s North Red Main Line.

    READ MORE
Results: 8 Projects found.